Skip to main content
Pay Now
Contact Us
Outage Map
Home

Loading NISC SmartHub log in. Please wait...

'Loading NISC SmartHub log in. Please wait...'
Menu
  • About Us
    • About Itasca-Mantrap
    • Board of Directors
    • News
    • Newsletters
    • Touchstone Energy Cooperatives
    • Associated Organizations
    • Bylaws & Articles of Incorporation
    • Contact Us
  • Member Services
    • Billing
      • Payment Options
      • SmartHub
      • Rates
      • Cold Weather Rule
      • Military Protection
      • Sales Tax Exemption
    • New Service
    • Service Improvements
    • Load Management Programs
    • Capital Credits
    • Contractor Information
    • Electrical Inspections
    • Member Privacy
  • Energy Efficiency
    • Rebates
    • SolarWise
    • Renewable Energy
    • Electric Vehicles
    • Energy Efficiency Resources
    • Together We Save
  • Community
    • Co-op Connections
    • Annual Meeting
    • Energy and Youth
    • GreenTouch
    • Operation Round Up
    • Touchstone Energy Community Award
    • Youth Tour
  • Safety
    • Call Before You Dig
    • Generator Safety
    • Surge Protection
    • Vegetation Management
    • Safety Quiz
  • Outage Center

New Service

Sign Up for a New Service!

New electrical services will be built to a permanent location according to the following:

Cooperative will provide:

  • Primary wire and connections
  • Transformer to be located a minimum of fifty (50) feet from any buildings
  • Meter socket, meter pedestal and/or current transformers and cabinet, to be located next to transformer or on the same pole as the overhead transformer.
  • Secondary wires from the transformer to meter socket
  • Meter

Applicant will provide:

  • Completed Application for Membership and Service Contract
  • Payment of $25 non-refundable processing fee
  • Payment of county recording fee for right-of-way easement
  • Payment of a $500 non-refundable new service fee
    *Service fee and application are valid for fifteen (15) months from the date of the application. If construction of services is requested after fifteen (15) months, applicant will submit an additional $500 non-refundable service fee.
  • After new service fee and processing fee paid, schedule date and time to meet with Staking Engineer to determine transformer/meter location
  • All necessary easements on forms provided by the Cooperative including full property legal descriptions for recording with appropriate county
  • A release of liability from unlocated underground objects or utilities on forms provided by the Cooperative
  • Tree trimming and right-of-way maintenance as determined by the cooperative:
    • Twenty (20) feet wide for underground lines
    • Fifty (50) feet wide for overhead lines
  • Payment of an aid to construction fee prior to construction:
    • $5.00 per foot for single phase primary (or)
    • $7.50 per foot for three phase primary
  • Any special permitting fees for crossing County, State, or Federal land, waterways or highways
  • Secondary wire, and
  • Installation of secondary wires from meter socket to building
  • Submit Request for Electrical Inspection and complete Electrical Inspection OR Verification from Electrical Contractor and copy of request

Non-standard service conditions:

  • Transformers in excess of 15 KVA shall incur an additional $1 per KVA charge each month for the life of the service
  • The excess KVA charge will not be enforced if the additional KVA is due to Demand Side Management loads

 Commercial Service:

Above applies except-

  • Payment of non-refundable new service fee

$1,500 for Single-Phase Commercial service

$2,500 for Three-Phase Commercial service

*Service fee and application are valid for fifteen (15) months from the date of the application. If construction of services is requested after fifteen (15) months, applicant will submit an additional $500 non-refundable service fee.

Please contact a Member Service Representative at 218-732-3377 or toll free at 888-713-3377 to apply for new service, or sign up to have a Member Service Representative contact you by filling out the form below.

Recent News

Member Notice - Office Closed

At Itasca-Mantrap, safety is our number one priority, for our members and for our team members. Your health and our team members' health are also our ...
more

COVID-19 May Influence Your Home Energy Usage

The kids are home all day - doing school online and, once the virtual school bell rings, off to TV or video games. Adults are working from home due to...
more

Pagination

  • Previous page‹‹
  • Page 2
Back to Top

 

OFFICE HOURS:
8:00 a.m. - 4:30 p.m.  |  Monday - Friday

PHONE:
(218) 732-3377 or (888) 713-3377

EMAIL:
itasca@itasca-mantrap.com

ADDRESS:
Itasca-Mantrap Cooperative Electrical Association
PO Box 192
Park Rapids, MN 56470

Employee Login

©2021 Itasca-Mantrap. All Rights Reserved. This institution is an equal opportunity employer.

  • About Us
    • About Itasca-Mantrap
    • Board of Directors
    • News
    • Newsletters
    • Touchstone Energy Cooperatives
    • Associated Organizations
    • Bylaws & Articles of Incorporation
    • Contact Us
  • Member Services
    • Billing
      • Payment Options
      • SmartHub
      • Rates
      • Cold Weather Rule
      • Military Protection
      • Sales Tax Exemption
    • New Service
    • Service Improvements
    • Load Management Programs
    • Capital Credits
    • Contractor Information
    • Electrical Inspections
    • Member Privacy
  • Energy Efficiency
    • Rebates
    • SolarWise
    • Renewable Energy
    • Electric Vehicles
    • Energy Efficiency Resources
    • Together We Save
  • Community
    • Co-op Connections
    • Annual Meeting
    • Energy and Youth
    • GreenTouch
    • Operation Round Up
    • Touchstone Energy Community Award
    • Youth Tour
  • Safety
    • Call Before You Dig
    • Generator Safety
    • Surge Protection
    • Vegetation Management
    • Safety Quiz
  • Outage Center